APT Awarded 20tph Lead Concentrating Plant for Eastern Europe

APT Awarded 20tph Lead Concentrating Plant for Eastern Europe

APT has received the order for a 20tph lead concentrating plant destined for Eastern Europe. This major milestone demonstrates the client’s faith in APT’s ability to deliver this important facility on time and within budget. It also underlines APT’s growing diversity into the wider spectrum of mineral recovery, which to date includes gold, platinum, copper,[…]

3tph Tailings Re-Treatment Plant in Northern Zimbabwe

3tph Tailings Re-Treatment Plant in Northern Zimbabwe

APT has just completed installing a 3tph tailings retreatment plant in northern Zimbabwe for a regionally based client. The plant comprises of a ball mill, feeder, classifier and two APT TriTank® CIL tanks. Designed to treat high grade artisanal tailings the set up incorporates several features to allow for a trouble free, robust solution. The[…]

Upgrading Concentrates before Smelting: mining equipment on site

Upgrading Concentrates before Smelting: mining equipment on site

One of the final stages of any gravity recovery circuit is upgrading the concentrates before smelting, often carried out on a shaking table. The material is first screened to prevent particle size vs. SG interaction, and then passed onto the vibrating table deck for the final gravity separation. The light sands are washed off the[…]

On A Small Scale Gold Mine Site: APT RG30 3tph scrubber & Goldilox

On A Small Scale Gold Mine Site: APT RG30 3tph scrubber & Goldilox

Here is a raw snippet from our time on a small scale gold mine site with APT’s Golidlox safe concentrates storage system operating in conjunction with the RG30 Scrubber for optimal mineral recoveries. The RG30 is a 3tph alluvial gold processing plant, available as either a standalone set-up or in trailer version. Our mining equipment[…]